News


E-House solution powers large platinum HIG mill

May 2022 News

A purpose-designed electrical house (E-House) from Zest WEG is driving one of the largest new high-intensity grinding (HIG) mills in the southern hemisphere, which was recently installed at a platinum mine in South Africa’s North West province.


The E-House solution from Zest WEG during manufacturing.

The size and operational parameters of the mill place demanding requirements on the equipment in the E-House, according to Tyrone Willemse, senior proposals manager at Zest WEG. Constructed in South Africa and incorporating a range of products made and distributed by Zest WEG, the E-House design also meets world-class safety and fire protection standards.

“The key benefit of the prefabricated E-House concept is the time it saves the customer and the high level of quality that can be ensured through its construction and testing under ideal workshop conditions,” he says. “The process is also streamlined as the complete project falls under a single provider who takes full responsibility for delivering on time and on budget.”

This E-House includes the HIG mill’s variable speed drive (VSD) and all its associated auxiliary circuits and starters. A range of WEG transformers and motors are also part of this project. With its extensive in-house expertise, Zest WEG generates fully detailed designs for its E-Houses, using 3D computer-assisted design (CAD) software.


The low-voltage room of the E-House with the internally arc type-tested IEC 61641 MCC.

“For this application, the E-House consists of a medium-voltage (MV) room and a low-voltage (LV) room,” Willemse notes. “The MV room houses the well-known WEG MVW01 VSD, with an integral oil-type, 12-pulse transformer manufactured locally at our transformer manufacturing facility in Wadeville.”

He explains that the WEG MVW01 makes use of high-voltage insulated-gate bipolar transistors (IGBTs) which lower the amount of power electronics circuitry needed. This also reduces the mean time to repair (MTTR), so that operations can be quickly restored in the event of a major fault on the system.

“The WEG MVW01 powers a WEG 3,75 MW, MGR 8-pole, 3,3 kV directly-coupled squirrel cage induction motor,” says Willemse. “This motor is specially designed to be vertically mounted to meet the HIG mill’s operation and maintenance requirements.”

Both the motor and the VSD were designed to meet the aggressive torque requirements during some phases of the mill’s operation. The combination comfortably handles the torque requirements that periodically exceed 170% for more than three minutes, giving the customer the necessary flexibility. The LV room contains the motor control centre (MCC) that feeds all the auxiliary circuits of the mill.


The medium-voltage room houses the well-known WEG MVW01 VSD.

“Importantly, we have installed the newly arc-proof type-tested IEC 61641 WEG board, which has the best rating for personal protection,” he says. “In the event of an internal arc, the MCC is fitted with an explosion duct that transfers any explosion safely out of the building.”

Another aspect of the safety features is a comprehensive fire detection and suppression system that meets the customer’s demanding standards. The two rooms are fitted with their own fully automated room-flooding suppression systems, which can flood the space with gas that douses electrical fires but is not dangerous to humans. “The system can detect smoke at a very early stage, and can also check against false triggering,” explains Willemse. “More than two smoke detectors must react, activating a loud bell for evacuation or cancellation before flooding takes place.”

The LV room also houses WEG CFW11 LV VSDs, which feed premium-efficiency WEG motors. The E-House’s small power and lighting circuits are fed by one of Zest WEG’s locally manufactured SANS780-compliant transformers.


The purpose-designed electrical house (E-House) being constructed, incorporating a range of WEG products.


Credit(s)



Share this article:
Share via emailShare via LinkedInPrint this page

Further reading:

Reinstatement opportunity for ECSA registration
News
In 2023 the Engineering Council of South Africa (ECSA) announced a special opportunity for engineers in South Africa to reinstate their registration status if it had been cancelled. This exclusive offer is available until the end of August 2024.

Read more...
Justice Malala to talk at exclusive breakfast
News
South Africa’s economic recovery and industrial growth depend on policy reform and business innovation. Few commentators are better placed to explore these challenges than Justice Malala.

Read more...
Beyond the exhibition: AATF 2025 Conference lineup brings exclusive
News
While the Africa Automation Technology Fair (AATF) 2025 exhibition floor will showcase cutting-edge automation solutions, the real game-changing insights will be found within the conference halls.

Read more...
How to claim CPD points
SAIMC Supplier Advisory Council News
SAIMC makes it possible for you to claim CPD points for attending courses and technical meetings, or completing an online quiz on a SA Instrumentation & Control magazine.

Read more...
Festo celebrates its centenary
Festo South Africa News
Creating added customer value through innovation has been the driving force behind the family-owned company from the beginning and remains the key to Festo’s success today. The company’s anniversary is being celebrated with employees, customers and partners worldwide throughout the year.

Read more...
RS Group cements its position as an ESG leader
News
RS Group has announced its inclusion in the prestigious CDP A-list, having improved its CDP rating this year from A- to A for its commitment to climate action, environmental transparency and disclosure

Read more...
ECSA awards full accreditation to IIE degrees
News
The Independent Institute of Education has received full accreditation from ECSA. This is the first private higher education provider in the country to be recognised in this manner by the industry authority.

Read more...
Growing demand for staple foods in Africa drives Bühler’s growth
News
Opportunities in strengthening local supply chains, especially within food processing and agribusiness, will be the main focus for Bühler Southern Africa in 2025.

Read more...
South African students advance to international round of Young Researchers awards
News
Two Masters in Engineering students from Stellenbosch University have advanced to the international round of the 2025 Blue Sky Young Researchers and Innovation competition. Their projects impressed the Paper Manufacturers Association of South Africa for their originality and relevance to the forestry sector, which plays a key role in producing wood and paper.

Read more...
The ultimate range for design and repair
RS South Africa News
Design and repair are fundamental aspects of any industry. The launch of the new RS PRO Design & Repair range caters to a wide array of industries, including discrete and process manufacturing, energy and utilities, facilities management and intralogistics.

Read more...