News


E-House solution powers large platinum HIG mill

May 2022 News

A purpose-designed electrical house (E-House) from Zest WEG is driving one of the largest new high-intensity grinding (HIG) mills in the southern hemisphere, which was recently installed at a platinum mine in South Africa’s North West province.


The E-House solution from Zest WEG during manufacturing.

The size and operational parameters of the mill place demanding requirements on the equipment in the E-House, according to Tyrone Willemse, senior proposals manager at Zest WEG. Constructed in South Africa and incorporating a range of products made and distributed by Zest WEG, the E-House design also meets world-class safety and fire protection standards.

“The key benefit of the prefabricated E-House concept is the time it saves the customer and the high level of quality that can be ensured through its construction and testing under ideal workshop conditions,” he says. “The process is also streamlined as the complete project falls under a single provider who takes full responsibility for delivering on time and on budget.”

This E-House includes the HIG mill’s variable speed drive (VSD) and all its associated auxiliary circuits and starters. A range of WEG transformers and motors are also part of this project. With its extensive in-house expertise, Zest WEG generates fully detailed designs for its E-Houses, using 3D computer-assisted design (CAD) software.


The low-voltage room of the E-House with the internally arc type-tested IEC 61641 MCC.

“For this application, the E-House consists of a medium-voltage (MV) room and a low-voltage (LV) room,” Willemse notes. “The MV room houses the well-known WEG MVW01 VSD, with an integral oil-type, 12-pulse transformer manufactured locally at our transformer manufacturing facility in Wadeville.”

He explains that the WEG MVW01 makes use of high-voltage insulated-gate bipolar transistors (IGBTs) which lower the amount of power electronics circuitry needed. This also reduces the mean time to repair (MTTR), so that operations can be quickly restored in the event of a major fault on the system.

“The WEG MVW01 powers a WEG 3,75 MW, MGR 8-pole, 3,3 kV directly-coupled squirrel cage induction motor,” says Willemse. “This motor is specially designed to be vertically mounted to meet the HIG mill’s operation and maintenance requirements.”

Both the motor and the VSD were designed to meet the aggressive torque requirements during some phases of the mill’s operation. The combination comfortably handles the torque requirements that periodically exceed 170% for more than three minutes, giving the customer the necessary flexibility. The LV room contains the motor control centre (MCC) that feeds all the auxiliary circuits of the mill.


The medium-voltage room houses the well-known WEG MVW01 VSD.

“Importantly, we have installed the newly arc-proof type-tested IEC 61641 WEG board, which has the best rating for personal protection,” he says. “In the event of an internal arc, the MCC is fitted with an explosion duct that transfers any explosion safely out of the building.”

Another aspect of the safety features is a comprehensive fire detection and suppression system that meets the customer’s demanding standards. The two rooms are fitted with their own fully automated room-flooding suppression systems, which can flood the space with gas that douses electrical fires but is not dangerous to humans. “The system can detect smoke at a very early stage, and can also check against false triggering,” explains Willemse. “More than two smoke detectors must react, activating a loud bell for evacuation or cancellation before flooding takes place.”

The LV room also houses WEG CFW11 LV VSDs, which feed premium-efficiency WEG motors. The E-House’s small power and lighting circuits are fed by one of Zest WEG’s locally manufactured SANS780-compliant transformers.


The purpose-designed electrical house (E-House) being constructed, incorporating a range of WEG products.


Credit(s)



Share this article:
Share via emailShare via LinkedInPrint this page

Further reading:

Reinstatement opportunity for ECSA registration
News
In 2023 the Engineering Council of South Africa (ECSA) announced a special opportunity for engineers in South Africa to reinstate their registration status if it had been cancelled. This exclusive offer is available until the end of August 2024.

Read more...
Understanding standby, prime and continuous gensets
WEG Africa Motion Control & Drives
The increasing reliance of South African businesses on generator sets to mitigate power disruptions highlights a crucial need for proper selection based on specific operational demands. Despite their growing usage, there is still widespread confusion about how to choose the appropriate genset, often leading to inefficient and costly decisions.

Read more...
Hytec opens fifteenth Mandela Day library
Bosch Rexroth Africa News
Over 200 learners at Monene Primary School in rural Limpopo have received their own containerised library. This is the fifteenth library since 2011, provided by Hytec South Africa and the Nelson Mandela School Library Project to schools across the country.

Read more...
CSIR survey on the state of cybersecurity in South Africa
News
The CSIR Information and Cybersecurity Centre has released four comprehensive national cybersecurity surveys. These delve into critical areas such as cybersecurity preparedness and resilience in the public sector, cybersecurity skills gaps, cybersecurity incidents, and the digital identity landscape in South Africa.

Read more...
Referro Systems partners with Festo in Northern Cape
News
Referro Systems has been recognised as an Authorised Official Partner Candidate for Festo in the Northern Cape, marking a significant milestone in its commitment to delivering best-in-class automation solutions to customers.

Read more...
Heavy-duty tablet achieves global certification
Vepac Electronics News
In a significant advancement for the company’s rugged tablets, the Teguar TRT-5380-10 heavy-duty tablet from Vepac has successfully acquired 11 international certifications, setting a new standard in quality, safety, and security across global markets.

Read more...
Bühler Johannesburg transforms Little Star Daycare Centre
News
Little Star Daycare in Vanderbijlpark has undergone a remarkable transformation, thanks to the generous support of Bühler Johannesburg.

Read more...
Schneider Electric and Harmony accelerate skills development
Schneider Electric South Africa News
Schneider Electric has formed a strategic partnership with Harmony Gold Mining to upgrade the instrumentation workshop into a state-of-the-art facility.

Read more...
WEG boosts local manufacturing capabilities
WEG Africa Motion Control & Drives
To improve its local manufacturing processes, WEG has taken delivery of two laser cutting machines and three bending machines. These have significantly increased productivity and efficiency, reducing internal delivery times, and ultimately customer lead times.

Read more...
RS South Africa showcases mining products and solutions
RS South Africa News
RS South Africa recently exhibited at MTE Steelport in Limpopo, and MTE Sibanye-Stillwater in Gauteng.

Read more...