System Integration & Control Systems Design


Legacy alarm upgrade for Uganda’s power generator

November 2021 System Integration & Control Systems Design

To alert operators of an event threatening the safety of assets, people or the environment, industrial sites rely on alarm annunciators directly hard-wired into various processes. When an event is detected, the relevant window on the annunciator panel lights up and sounds an alarm, notifying operators that a response is required. For Eskom Uganda’s hydroelectric plants in Jinja, this event could be a generator component failure which, if not caught immediately, could cause costly damage to plant assets.

But, in a digital age, where we rely so heavily on computer-based equipment, do we still need bulky, hard-wired annunciator panels?

Why alarm annunciators?

The answer is yes. It is true that PC-based systems provide efficient monitoring and reporting across a range of communication points in an industrial setting. However, we often see companies overloading their systems with complex visualisations, making it difficult to identify and act on critical alarms when they arise.

Alarm annunciators are therefore critical for operators to identify and act on an event before any serious damage is caused. But what happens when the original annunciator manufacturer can no longer supply spare parts, or support you when you need to upgrade your system?

Fit, form, function

The problem we now find is that many alarm annunciators used today were installed decades ago and do not meet the current IEC 61508 safety integrity levels. What’s more, many former alarm system providers no longer exist to offer support. This is why Eskom enlisted Omniflex to replace its obsolete legacy Highland Rochester MPAS90 49-point system.

Retrofitting a new alarm system need not be costly or inconvenient for operators. Alarm annunciator specialists can consult on and manufacture a system designed to replace obsolete alarm systems from any manufacturer. This can be done utilising the existing cabling to minimise disruption and installation costs.

In the case of Uganda’s hydroelectricity stations, the new Omni16R annunciator system was retrofitted into the existing panel space. The IEC

standard 3U rack was factory engineered to match that of the legacy annunciator and it was bench tested before installation on site. This allowed staff at the facility to make the retrofit without the need for specialist tools or engineers and the existing wiring was matched with the terminals of the new unit. The old 50 VDC powered energy-intensive incandescent lamp alarm displays were replaced with modern energy efficient high-brightness LED technology.

The biggest challenge for any company looking to upgrade its alarm system is doing it without disrupting existing cabling. For Eskom, all annunciators were wired to the existing 50 VDC wetted field contacts. This was achieved using 16-channel isolated terminal boards, connected via ribbon cables to the rack. The team was able to engineer this off-site to help reduce installation time and disruption to plant productivity.

Future proofing your system

The process of retrofitting an alarm system is relatively straightforward, but the importance of digitalising alarms must not be understated.

As well as giving local visual and audible indications to notify operators of an abnormal occurrence, each annunciator can be connected as a Modbus slave device on an RS485 network. This means all alarms can be remotely monitored either on a DCS or a local scada system and can provide historical pre- and post-alarm data needed for auditing and fault diagnostic purposes.

As Uganda’s largest electricity generator, there is a lot at stake for Jinja’s power plants. Simply retrofitting a modern system with the capacity for remote monitoring leverages operator efficiency and improves alarm management, which all contributes to an efficient running plant with KPI monitoring.


Credit(s)



Share this article:
Share via emailShare via LinkedInPrint this page

Further reading:

Keeping mine outstations connected
Omniflex Remote Monitoring Specialists Industrial Wireless
Remote monitoring specialist, Omniflex has helped wireless data communications systems firm, Scan RF implement site-wide monitoring systems at the 17 000-hectare Kolomela iron ore mine in South Africa.

Read more...
Simplifying battery management for remote dual-voltage systems
Omniflex Remote Monitoring Specialists Electrical Power & Protection
Ian Loudon, international marketing and sales manager at remote monitoring specialist, Omniflex outlines the advantages of dual-voltage power supply in field environments.

Read more...
The time is now for systems integrators
Editor's Choice System Integration & Control Systems Design
Integrators combine sophistication regarding technology innovation with practical, hands-on experience. Collaborating with systems integrators is the means to significant productivity improvement, powered by the convergence of automation and information and operations technology.

Read more...
The role of alarm annunciators in temperature monitoring
Omniflex Remote Monitoring Specialists Temperature Measurement
Director at alarm annunciator specialist, Omniflex explores the importance of alarm annunciators in temperature monitoring applications, drawing on examples from different industrial settings.

Read more...
System integrators are a diverse market
Editor's Choice System Integration & Control Systems Design
System integrators (SIs) combine expertise on emergent technologies with real world experience. Working with SIs, it’s inevitable that at some point someone will say, “We’re not a typical SI.” And in many ways, it’s true. SIs come in all shapes and sizes.

Read more...
Avoiding the pitfalls of PLC and scada control system integration
Iritron System Integration & Control Systems Design
Upgrading your control system by integrating PLCs with scada systems should be a simple seamless process. Regrettably, the industry is plagued with control system integration and upgrade myths and misconceptions that can lead to liability issues, project delays, cost overruns and decreased plant performance.

Read more...
EtherCAT measurement terminals for vehicle development at Mercedes-Benz
Beckhoff Automation System Integration & Control Systems Design
At the Mercedes Technology Centre plant in Sindelfingen, Germany, car axles are examined with the highest precision on four test benches, in parallel with road tests and simulations. All data is acquired using PC-based control from Beckhoff.

Read more...
Loop signature 23: Tuning Part 2.
Editor's Choice System Integration & Control Systems Design
It is my opinion that most tuning methods are very crude. They do of course also offer a starting point for tuning if one is not fortunate enough to have a sophisticated tuning package like a Protuner around.

Read more...
Keeping an eye on invisible radiation
Omniflex Remote Monitoring Specialists Analytical Instrumentation & Environmental Monitoring
At its peak in 1994, the energy generation capacity of the UK’s nuclear power stations was 12,7 GW across 16 plants. In 2024, the capacity has fallen to around 5 GW, and the number of stations is down to nine. However, this is far from the end of the story as spent nuclear fuel remains radioactive for centuries, and requires rigorous safety processes to safeguard against leaks.

Read more...
PIC microcontrollers with integrated FPGA features in TME
System Integration & Control Systems Design
The new PIC16F131xx microcontrollers in TME’s offering from Microchip are ideal for the evolving and miniaturising electronic equipment market, offering efficient power management and predictable response times for controllers.

Read more...