Mean Well has added two more 125 W isolated dual output models to its G3 series high reliability miniature product family. The RID-125-1205 and RID-125-2405 models are AC/DC switching power supplies that can provide 125 W and require only free air convection.
Consistent with the features of other G3 series products, all the electrolytic capacitors in these two new models are rated at 105°C. The models can withstand 300 V a.c. input surge for 5 seconds and 5 g vibration, making then well-suited for operation in harsh environments.
With 12 V or 24 V main output channel (Ch1) and up to 180% of high peak load capability and 5 V 3 A (Ch2) for logic control usage, they are ideal for motor-based machinery, automation equipment, test equipment, POS systems, printers or plotters. The isolated design between Ch1 and Ch2 prevents noise originating from a motor load from entering control circuits.
Other standard functions include short-circuit, overload, and over voltage protections. Approved to UL/CUL/TUV/CB/CE, these supplies measure 199 x 98 x 38 mm.
Four-digit multifunction instrument Vepac Electronics
Electrical Power & Protection
The OM 403 model series comprises four-digit panel programmable instruments designed for maximum usefulness and user comfort, while maintaining their fair price.
Read more...New function/arbitrary waveform generator Vepac Electronics
Electrical Power & Protection
Siglent has released the SDG1000X Plus series Function/Arbitrary Waveform Generator, providing engineers with a more flexible and efficient signal generation solution.
Read more...World’s fastest 14-bit arbitrary waveform generator Vepac Electronics
Electrical Power & Protection
The ARB Rider AWG-7000 is the world’s fastest 14-bit arbitrary waveform generator, with a 20 GS/s real time update rate and 14-bit vertical resolution. Thanks to Simple Rider software, it offers best-in-class performances and an easy to use interface.
Read more...Steam on demand
Electrical Power & Protection
Rental boilers are increasingly popular, offering the convenience of on-demand power and heat without the commitment of a permanent installation. They are an ideal solution while a customer awaits repairs, or only needs a boiler for a particular period, or does not have the capital to invest upfront.
Read more...High-voltage backup power solutions
Electrical Power & Protection
Businesses are facing increasing pressure to rethink their approach to power. As a result, there’s been a significant uptick in interest in high-voltage installations, either as standalone battery energy storage systems, or as solar installations feeding into battery storage.
Read more...Rotary friction welding – a first for Tutuka power station
Electrical Power & Protection
Steinmüller Africa has successfully used rotary friction welding in a project with engineering consultant, eNtsa. This innovative technique was applied to fabricating four headers used for high-pressure water heater boiler units installed at Tutuka power station in Mpumalanga.
Read more...Why it is vital to size soft starters carefully WEG Africa
Electrical Power & Protection
The application of soft starters has become a well-established strategy to improve the uptime and lifespan for motors and mechanical equipment driven by motors, but they need to be chosen carefully.
Read more...Changeover switch between two power supplies Schneider Electric South Africa
Electrical Power & Protection
Schneider Electric South Africa has unveiled the Resi9 Changeover Switch product range which provides the perfect solution to switch manually between two power supplies or circuits.
Read more...Partial discharge monitoring solution for MV switchgear Schneider Electric South Africa
Electrical Power & Protection
Schneider Electric South Africa has unveiled its PowerLogic PD100 Partial Discharge Monitoring Solution, designed to be installed on MV switchgear to detect anomalies early, to prevent unplanned downtime.
Read more...Boiler update at food processing plant transforms production process
Electrical Power & Protection
The replacement of 78 year-old boilers at a Western Cape food processing plant by Associated Energy Services has not only proven to be a worthwhile investment for the client, but has transformed its entire production process.